Connect the tube stator cable from the generator's stator board to the X-ray tube housing.
Perform filament calibration for all focal spots (small and large) to ensure mA accuracy.
Proper mechanical alignment prevents structural stress and ensures accurate imaging geometry. Unboxing Inspection Inspect all crates for tilt or shock indicator alerts.
: Verify that the ceiling rails and floor rails are correctly aligned. For ceiling-mounted systems, ensure the overhead support beams are of high quality and firmly secured. Power Supply drgem x ray service manual install
Connect the main cabling between the tube head and the generator cabinet. 4. Configuring the GXR Generator (Service Mode)
Crucial: Secure the earth cable to prevent electrical shock. Emergency Switch: Assemble the emergency stop switch. Assemble the Tube Cover: Secure the housing covers.
Inspect the high-voltage cable plugs and the receptacles on both the X-ray tube and the high-frequency generator. Ensure they are free from dust, moisture, and debris. Connect the tube stator cable from the generator's
Mount the manual or automatic collimator onto the tube port flange, ensuring the alignment pins seat correctly. Secure the locking screws.
Secure the floor rails or ceiling mounts first. Use a spirit level to ensure the vertical column is perfectly upright.
Attach the manual or automatic collimator to the tube port flange, ensuring the internal mirror is clean and undamaged. Unboxing Inspection Inspect all crates for tilt or
Adjust the LCD module contrast (CW for bright, CCW for dark).
Test the emergency stop buttons on the console, table, and tube crane to confirm they instantly cut power to all motorized movements and radiation circuits.
The floor must be perfectly level to prevent mechanical drift of the X-ray tube or table.
Secure ceiling and floor rails. Use a plumb bob to ensure the floor rail centerline is exactly 19mm ahead of the ceiling rail for proper alignment.